Don’t forget to subscribe: https://bit.ly/2Hb8hjx
Watch more interesting videos: https://bit.ly/34ogCaw
Follow Channels Television On:
Facebook: https://www.facebook.com/channelsforum/
Twitter: https://twitter.com/channelstv
Instagram: https://www.instagram.com/channelstelevision/?hl=en
Get more news on our website: https://www.channelstv.com/
#ChannelsTv
source
Time to start buying up land in and around the area
It's a welcome development.
Iconic and interesting design… it's a design that can easily be remembered and associated with Lagos….. once people see the picture they will know it's Lagos, Nigeria…I'm going to give it the name…. today 31st December 2022……. "The Fish Bridge" Lagos……
I pray, in the name of Jesus, that THIS project will be completed in spite of political, economical and other unseen but inevitable factors before the year 2030. It would be a great boost to the economy of Lagos State in every way especially for the "new Lagos" area and Nigeria as a whole.
Iconic structure. It looks like a fish if you look closely.
Jagaban master plan must continue in Lagos.
I don't get it. So who is the preferred bidder or is that a secret?
Beautiful design. Luv the minimalism plus it's an original style. โก
wait, what route is that exactly?
Beautiful plan, and itโs very cheap in cost ๐ค. The bodo-Bonny Island 39.4Km bridges and roads that will connect Bonny island to Rivers mainland in a very challenging swampy, marshy and difficult terrain is N120B, and is JB that is handling it.
..And we are talking almost 2Trillion Naira for this? Nawa o.
I don't approve it if it doesn't have bycicle and jogging lane for adventure and leisure on the side
I don't know understand the route but since was well plan for Lagos to Nigeria go are head
Election time Promise time
The design is dated imo & I am not sure why Lagos Ibadan route is an effective choice. Less amount of demolition should be 1 of 10 factors to consider. Removing congestion from Ikeja Axis and Agege axis to ensure one can move mass volumes of citizens to and from the island. I think they should have a clear demo/ illustration of the route when performing another PR session.
As long as Tinubu is in charge of Lagos, this project will not be completed in 4 years. In fact, if it is completed in 10 years, itโs completed early. The cost of the project will be revised and revised and revised tillโฆ I am only hopeful that, like the uncompleted but advertised monorail, the 4th Mainland bridge doesnโt take 20 years to complete.
Major cash out.
Lagos state, always setting the pace with river state following behind.